Dear Senaite Community,
is it possible in Senaite to have 1 author, 1 verifier and 1 release signature? This is a requirement in GMP regulated Labs.
Does someone have experience with LIMS in GMP regulated Labs (or propably GLP as well)?
do you mean 1 author, 1 verifier and 1 release signature in the final results report (aka. “Werkszeugnis” based on DIN EN 10204)? If so, then this would be possible with senaite.impress (https://github.com/senaite/senaite.impress), but with some customizations regarding the release process and probably versioning of some test-plans/profiles to get this “author” signature in place.
Not sure if this answers your question, maybe you can provide more details.
Well, thanks for your input.
Definitely, the impress Plugin would be nice AS it would allow creating custom reports (CoA templates).
Our workflow would be like this:
sample (drug product) comes in
reference standard comes in
distinct analysis are made (ph, Osmolality, Water Content, Assay (HPLC))
I get back the results from all instruments / methods
for each of those, i need the performing analyst written somewhere
a second analyst will verify the results of each assay (Signaturen by password entry)
a head of quality control will review all results of that drug product and release the results (Signaturen by password Entry)
for each results I need to be able to show who signed for what part in the End
then, make a CoA oft all results for one drug product
the CoA is released by head of QC
at that point the CoA Kay be sent to the customer
I think Senaite would be up to the task. Just wondering how to get the Signaturen right.
Ok, thanks grulisco, this sounds really good!
Another point very relevant for me is the validation of the LIMS:
is there any kind of validation been done of Senaite LIMS? For example acc. 21 CFR Part 11 “Electronic Records and Electronic Signatures” or acc. EU GMP Guide Annex 11 and Annex 15?
I mean: Tests, that all functions work as expected, by design
is there any guidance as how to validate if Senaite has been isntalled properly and is functioning as designed (after isntallation and according previous validation)
I mean: what tests to perform, to show that it was installed properly
We plan to test, introduce senaite LIMS while auditing it by those guidelines. (…and keep records about this process)
If some topics will not be sufficient in technical sense we have to complement our processes with organisational measures.